Media Banner

Increase of Water Allocation for Power Generation at Kariba

25 June 2021

Lusaka, 25th June 2021 – The Zambezi River Authority (the Authority) hereby announces an increase in water allocation for power generation at Kariba by 12 Billion Cubic Meters (BCM).

Download Press Release