Consultancy to undertake the Engineering Feasibility studies and the Environmental and Social Impact Assessment Studies for the development of the Batoka Gorge Hydro Electric Scheme (BGHES) Additional Transmission Lines

Launch Date: 
Friday, March 1, 2019
Due Date: 
1 March 2019

The Zambezi River Authority (The Authority), a bilateral organisation owned by the Republics of Zambia and Zimbabwe and mandated to operate, monitor and maintain the Kariba Dam Complex as well as exploit the full potential of the shared portion of Zambezi River located along the common border between the two Countries is undertaking the development of the Batoka Gorge Hydro Electric Scheme (BGHES), 47 Km downstream of the Victoria Falls, along the Zambezi River.